2015 CHANGE ORDERS Change Order AIA Document G701-2007 PROJECT: CHANGE ORDER NUMBER: 001 OWNER ❑ Jefferson County Clerk and Recorder DATE: 07110!15 ARCHITECT ❑ 201 West Centennial Ave. Boulder,MT 59632 ARCHITECTS PROJECT NUMBER: 1311 CONTRACTOR ❑ TO CONTRACTOR: FIELD E]ThinkOne Construction Management CONTRACT DATE: April 16,2015 101 E. Main, Studio 1 OTHER ❑ Bozeman, MT 59715 CONTRACT FOR: General Construction The Contract is changed as follows: 1.Per Change Request#1 R prepared by ThinkOne and dated 07110115,change flooring materials at the main lobby,rest- rooms and break room as requested by the Owner. Cost: Increase$13,720.00 2.Per Change Request#2 prepared by ThlnkOne and dated 06123115,provide structural truss bracing and structural col- umn support as required by the structural englnear's review. Cost: Increase$1,678.00 3.Per Change Request#3 prepared by ThinkOne and dated 06/23115,provide"pony"wall framing and electrical outlet changes to accommodate outlets at casework. Cost: Increase$350.00 4. Per Change Request#4 prepared by ThlnkOne and dated 06123/15,add protective metal in roof valleys and pitch breaks as requested by the Owner. Cost. Increase$6311.00 5.Per Change Request#5 prepared by ThinkOne and dated 06/23/15, provide electrical changes to accommodate the amperage change on the condensing units and sensor Changes at the lobby ceiling. Cost: Increase$1,301.00 6.Per Change Request#6 prepared by ThinkOne and dated 06/23/15, provide additional excavation of topsoil and import of structural fill to accommodate discrepancy in top sail depth from Geotechnical Report Cost, Increase$9,955.00 7. Per Change Request 47 prepared by ThinkOne and dated 06123/15,substitute PEX piping for the originally specified cop- per piping on domestic water system, Cost: Decrease$300.00 8.Per Change Request#8 prepared by ThinkOne and dated 07107115, provide support strapping below the vapor barrier at the bottom of the roof trusses. Cost: Increase$1,421.00 The original Contract Sum was $ 739.500.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 739 500.00 The Contract Sum will be(increased)(de_.-___ed)(1meha ived) by this Change Order in the amount of $ 28,763.00 The new Contract Sum including this Change Order will be $ 768.263.00 The Contract Time will be(inereaseely(deereased (unchanged)by ( 0 )days NOT VALID UNTIL SIGNED BY THE ARCHITECT,CONTRACTOR AND OWNER. SMAArchitecls Think One Construction Management Jefferson County ARCHITECT CONTRACTOR OWNER 2625 Winne Avenue,Suas 1 101 East Main.Studio 1 P.O.Box H Helena,MT 59601 Bozeman,MT 59715 Boulder.MT 59632 BY(signature) t B f5ignatu* Y fSignalwe) I �.1."-n FLS �� �i:aseztr l 4AS 1106)1 cg/ (Pdnled name) (Pdnted name) (Printed name) 0-1 tfo • ls 1.16.16 _p7� 17-15� DATE DATE DATE No ane snaotng one ouno environmenri arcruueccure construction management renewavie enepw services osvetonmeno JUIy10, 2015 Jefferson County 202 West Centennial Boulder, MT 59632 RE: Jefferson County Clerk and Recorder's Annex:Flooring Changes Dear County Commissioners, ThinkOne Construction Management,LLC provides the following cost proposal for the requested flooring changes to the Clerk and Recorder's Annex. 1. Change the flooring at the Lobby 113 from carpet tile CA? to Porcelain Tile The product is Surface Art,Venetian Reale Collection,Alpine Slate, Color is Multi Oxide,sizes vary from 18"square to 6"square)random pattern). The base is alpine slate bullnose. The deduction for carpet tile &rubber base is $4140. The addition for porcelain tile is S 17,51 D. This would result in an increase of$13,370. 2. Change the sheet vinyl in the restrooms and break room from Johnsite sheet vinyl to Armstrong Commercial Flooring,Striation BBT, Color T3610 Haze which is a 12"x 24"Pile size. This would result in an increase of$350. If you choose to accept these changes, the overall change to the contract would be an increase of$13,720. Please contact me at 586-7020 if you have any questions Sin rey uss II Harris, PPM I�resident,ThinkOne Construction Management,LLC lol a main souolo one oozemen Mr 59715 Qnone 406.596.7020 FaN 496.696.5479 winK1.00m arcntGSnGUre menagemenu servtces bullang bebnnbinou Nmbegranen snergH sgsbem5 June-23, 2015 County Commissioners Jefferson County 202 West Centennial Boulder, MT 59632 RE: Jefferson County Clerk and Recorder's Annex: Change Request#2 Dear.County Commissioners, ThinkOne Construction Management, LLC provides the following change request for the required structural changes to the Clerk and Recorder's Annex. Specifically, the "gable end wall bracing" changes were directed by the structural engineer via her field report dated 6/5/15. During shop drawing review of the steel columns, an additional structural "bucket"was added to the column as a truss support. Framing Labor $ 936 Framing material $ 497 Steel addition $ 245 Total $1678 This change request would be an increase to the contract of $1,678. Please contact me at 586-7020 if you have any questions 6 jnc ti Harris, P PMt, ThinkOne Construction Management, LLC io amain su n10 One bbzeman mG 50115 bn0ne4055857020 PaH4M588.8410 bnmlitcom G 11� n2qin3 bLIilU arcnibecbure management se"ioes ',.. oulaing ceonnacgy'. mbegnabeo energu sysnems June 23, 2015 County Commissioners Jefferson County 202 West Centennial Boulder,MT 59632 RE: Jefferson County Clerk and Recorder's Annex: Change Request#3 Dear County Commissioners, ThinkOne Construction Management,,LLC.provides the following change request for minor framing & electrical outlet changes to the Clerk and Recorder's Annex. Specifically, this change was approved in RFI,#4 and it adds a framed pony"'wall and relocates outlets at cabinetry in the "Open Office'area. Framing Labor $ 152 • Framing material S 63 • Electrical labor S 135 Total S'350 This change request would be an increase to the contract of 8350. Please contact me at 586-7020 if you have any questions Sincerely, L' 1 R sell Harris, PPM resident, ThinkOne Construction Management, LLC wi a main sbuoia one bozeman mb 5s115 s bnone4065e87020 PaH4065998410 bnmHlcom nll e t =om r r HPCnIGHCGUre managemeno services BUpoing beonnoiaou InregraneaenergususGems June 23, 2015 CaumyCommissioners Jefferson County 202 West Centennial Boulder, MT 59632 RE: Jefferson County Clerk and Recorder's Annex: Change Request#4 l ` Dear County Commissioners, ThinkOnesConstruction Management, LLC provides the following change request for roofing changes to the Clerk•and Recorder's Annex. Specifically, this change was requested by the Owner and was approved in RFI #6. It adds protective metal in the roof valleys and pitch breaks. • Roofing Labor $ 240 _• Roofing material $ .3.98 Total' S '638 Tnis.feffari'ge request would be an increase to the contract of$638. Please contact me at 586-7020 if you have any questions Sincerely, R s ell Harris, PPM P sident, ThinkOne Construction Management, LLC ; i ,i ICI a main souaio one Bozeman mG 59715 orionG4D558e.7I120 PBH408.6888170 Gmmki COm ` rininmone e1`CnItlBCGare menegemeno samoes bul01ng reannolo®U inGegrareeenergususcems June 23, 2015 ` County Commissioners Jefferson County, 202 West Centennial Boulder, MT 59632 RE: Jefferson County Clerk and Recorder's Annex: Change Request#5 Dear County Commissioners, T onstruction Management, LLC provides the following change request for electrical changes , ta'the'Clerk and Recorder's Annex. Specifically,this change was identified by the:electrician and the solution was directed by the electrical engineer. The changes are required due to an amperage change in the condensing units and a ceiling sensor in 113 to control lighting. • Amperage change labor S 445 • Amperage change material $ 525 • Lighting sensor labor 5 146 Lighting sensor material S 185 Total $1301 Tki�s change request would be an increase to the contract of$1301. Please contact me at'586-7020 if you have any"Ouestions i Sincerely, R ssell Harris, PM resident,`ThinkOne Construction Management, LLC roi a main suuam one bowman mG 59715 phone 4138599.)020 P8M4053998470 bhlnK COT.. Gres snaning nne nut n rann;ene o"' 08bure management semoes oueom8 oeonnotoQu mGeereneo enerou syanenv9:' June 23, 2015 County Commissioners Jefferson County 202 West Centennial Boulder, MT 59632 RE: Jefferson County Clerk and Recorder's Annex: Change Request#6 Dear County Commissioners, Thinkone construction Management,:LLC provides the following change request for earthwork changes, to the Clerk and Recorder's:Annex. Specifically, this change was identified during excavation. The existing depth of topsoil was 20"versus 12" as defined by the project geotech report. This changea resulted in,206 cubic yards of additional topsoil that was excavated and trucked offsite Therefore, an additionai 206 cubic yards of structural fill had to,be provided,trucked onsite, placed and compacted:' • Excavate 206cy topsoil &truck offste $ 3908 • Provide 206cy of structural fill $=3317 • Place and compact 206cy of structural fill $ 3090 Deduction for sprinkler work $ ( 360) Total $ 9,955 ,This change request would be an increase to the contract of$9,955; Please contact meat 586-7020 if , you'have any questions 1 a Sincerely, Ruu ll Harris,-PPM President, Thinkone Construction Management, LLC i im a mem sourim one Bozeman ma se7m i onone Awmewma Pam4oe5es"7o 'onmRl.00rn ? tinnione ;napmg me nwiti nriv!oormenn artlnroectlure mana®ameno servioes bulloing UsennOIDOW inbearabetl enerou GUSbems June 23, 2015 County Commissioners Jefferson°County ,, , 202 West Centennial Boulder, MT 59632 RE: Jeffers n bounty=Clerk and Recorder's Annex: Change Request#7 Dear County Commissioners, ThinkOne Construction Management, LLC provides the following change request for.plumbing changes to the Clerk and Recorder's Annex. Specifically, this change entails changing from copper piping to PEX piping for hot and cold water lines. The PEX piping would be insulated in accordance with the drawings. This was discussed with the Owner and is generally thought to be a better product in this specific instance because of the reduced number of fittings (leakage) and the reduced risk of future pitting that is common to topper piping in the Boulder area. Deduction for PEX labor&materials (S 300) This change request would be a decrease to the contract of 5300. Please contact me at 5 86,4020 if you have any questions Sincerely, i j"Rsvil Harris, PPM ent, ThinkOne Construction Management, LLC 101 a main sGOtl10 one boZBTHn min 89 715 pnone405588.7020 P8K408898e490 bhmKI.G0M ' titimKone enataane cne puup anvironmenp �. raxaemeam S ' AI - te� Y k { w - s 'g, ,O lE leffer5ti7�C x` AN lefferson.County Clerk and Recorders Annex Change,Request#8 `` z, a r ? Dear C6untyyy Commissioners, s a , ' -z Pin' "• gonstruction Management LLC prevides_the following change request forsmsulabon°€ha the an a nnx Specafically"thlcha�igggx+Nas approved Iri RFI#7 and at engs adding svpptng x 7e ceiling ms4{at�a5 ate the co tern for the insulatio to drop out'of tpro r lRattono--Thf was dlStuswd th the Qwtaer an�i•bal appr valf v pfi 9Nien to pr Lat�tto tt�tvapping.' $ 5 . rr :k Materialmaddth aRRa�9 $2$ s " try ^:.-s»' 1"-n . Tt7!s cfiange'.request would bean increase to the co,Attrart of 1421 P)ea a contact t 51 020 of have any ,. quest7ons � a �� k x tt $1 ! e r x 1" Ru a,,. `�' Th n `" Cturstsuction rieM LLC - IIA Ilf nwq Al p i a. .4 Gfuf�'Hsrt ya• Imo. k{ v r L {,• - i w# d VI PFII ma a maim impumbne &j'G tmlr.pmIp9716 �. i =k dwn� ab.�oao•'�5aerraos.5eaea�n.gtlnrscoom